| News | |
| About RhodeWays | |
| About the TMC | |
| ITS Technologies | |
| ITS Glossary | |
| Statistics & Reports | |
| Video |
Choose a video from the list below.
| Moving the new Providence River Bridge |
5MB![]() |
| Jamestown Bridge Demolition, Phase 1 Eastbound View Westbound View |
(East) 0.8MB (West) 0.8MB |
| Jamestown Bridge Demolition, Phase 2 Eastbound View Westbound View |
(East) 3.2MB (West) 0.7MB |
| Jamestown Bridge Demolition Underwater demolition: 8/24/06 |
2.9MB |
| Jamestown Bridge Demolition Underwater demolition: 9/14/06 |
620KB |
| 511 Launch: James Capaldi, RIDOT Director, part 1 | 8.2MB |
| 511 Launch: James Capaldi, RIDOT Director, part 2 | 5.0MB |
| 511 Launch: Lucy Garliauskas, FHWA Division Administrator | 4.0MB |
| Field video The TMC uses lowering devices, like the one shown in the video, to make maintenance and service of our camera equipment easier at higher installations, such as on this cell tower. In this example, Michael Hodgkinson (Buck), VHB Technician, is demonstrating the lowering device. |
600KB |
| TMC Introduction and History | 2MB |
| Benefits of ITS | 1.1MB |
| ITS Components | 2.6MB (This video was produced in the late 1990s, before recent ITS technology upgrades and installations.) |
| TMC Mission | 0.8MB |