Interstate Highway Restrictions
» Overnight
Pawtucket: I-95, from Exit 29 (Broadway) to Exit 30 (East St./Central Falls), various lane closures for bridge inspection, Monday & Tuesday from 9 p.m. to 5 a.m. on the following nights:
- Monday: NB only
- Tuesday: SB only; Exit 29 may be briefly closed
Pawtucket: I-95 NB & SB, from Exit 27 (Downtown) to Exit 28 (School St.), right lane closed for bridge work, Sunday-Thursday nights from 9 p.m. to 5 a.m.
Providence: I-95 NB, from Exit 19 (I-195) to Exit 21 (Broadway), left lane closed for bridge inspection, Sunday night from 9p.m. to 5 a.m.
Providence: I-195 WB, from Exit 2 (South Main St.) to I-95, various lane closures for construction, 9 p.m. to 5 a.m.
» Continuing
Pawtucket: I-95 between Exits 27 (George St.) and 28 (School St.) posted for use only by vehicles of less than 18 tons. Heavier vehicles should use I-295, Rte. 146 or city detours.
West Greenwich: I-95 NB & SB between Exit 5 (Rte. 102) and Exit 6 (Rte. 3), motorists will find travel lanes shifted to the left for bridge construction.
Back to top |
|
Other Limited Access Highway Restrictions
»Weekday
North Smithfield: Rte. 146 NB & SB, at the Forestdale exit, alternating lane closures for bridge work, Monday-Friday from 7 a.m. to 3 p.m.
Providence: Rte. 6 EB & WB, from the Dean St. on-ramp to Hartford Ave. exit, various lanes closed for survey work on the following days from 7 a.m. to 3 p.m. (EB closures do not begin until 9 a.m.):
- Monday: WB, right lane closed. Also, left lane on the Plainfield Street off-ramp closed.
- Tuesday: WB, left lane closed.
- Wednesday: EB, right lane closed
- Thursday: EB, right lane closed. Also, left lane on the Plainfield Street on-ramp closed.
»continuing
Narragansett/South Kingstown: Rte. 1, from Wakefield exit to Salt Pond Rd. exit, new traffic pattern in place due to bridge reconstruction. All lanes shift; two-way traffic on SB bridge with two lanes SB and one lane NB.
Portsmouth/Tiverton: Sakonnet River Bridge (Rte. 24) posted for use by vehicles under 18 tons. Heavier vehicles must use alternate routes. The bridge is safe for passenger vehicles.
Back to top |
|
Regional Restrictions
Metropolitan Providence
City of Providence street closures
» Overnight
Providence: Wickenden St., from Benefit St. to South Water St., lane closures for bridge demolition, Sunday-Thursday nights from 6:30 p.m. to 5 a.m.
» Weekday
Pawtucket: Taft St. and Pleasant St., from Division St. to East Ave., possible lane and shoulder closures for bridge work, Monday-Friday from 7 a.m. to 3 p.m.
Providence: Dean St., from West Exchange St. to Atwells Ave., alternating lane closures for construction, Monday-Friday from 7 a.m. to 3:30 p.m.
Providence: Rte. 6 EB & WB, from the Dean St. on-ramp to Hartford Ave. exit, various lanes closed for survey work on the following days from 7 a.m. to 3 p.m. (EB closures do not begin until 9 a.m.):
- Monday: WB, right lane closed. Also, left lane on the Plainfield Street off-ramp closed.
- Tuesday: WB, left lane closed.
- Wednesday: EB, right lane closed
- Thursday: EB, right lane closed. Also, left lane on the Plainfield Street on-ramp closed.
» Continuing
Providence: Click here for detailed information on all road and lane closure information in Providence.
Back to top |
|
East Bay
» Continuing
Barrington: Access to Mathewson Road from Rte. 114 (County Road) at the Barrington Bridge will be closed until Spring 2010 for construction of a retaining wall. Motorists should follow detour using Rumstick Road and Jennys Lane.
Back to top |
|
Newport County
» Sakonnet river bridge project
Tiverton: Weekly updates of construction activities impacting local streets will be posted on the RIDOT website at www.dot.ri.gov. Local access to homes will be maintained at all times. The following restrictions are scheduled:
- Riverside Dr. closed to through traffic, Monday-Saturday from 6:30 a.m. to 4 p.m.
- On-ramp from Hummocks Ave. to Rte. 24 NB closed until mid 2010. Use Anthony Rd. to Boyd’s Lane to detour.
- Hummocks Ave., under Rte. 24 overpass, lane closed with alternating traffic pattern for construction, Monday-Friday from 7 a.m. to 4 p.m.
- Off-ramp at Exit 5 (Rte. 138/Main Rd.) from Rte. 24 NB, lane narrowed for construction.
- Pile driving ongoing Monday-Saturday from 7 a.m. to 4:30 p.m.
» weekday
Middletown: West Main Rd. (Rte. 114) from Coddington Highway to John Kesson Lane, possible lane closures for electrical work, Monday-Friday from 9 a.m. to 3 p.m.
» continuing
Portsmouth/Tiverton: Sakonnet Bridge (Rte. 24) posted for use by vehicles under 18 tons. Heavier vehicles must use alternate routes. The bridge is safe for passenger vehicles.
Back to top |
|
Northern RI and Blackstone Valley
» Weekday
North Smithfield: Rte. 146 NB & SB, at the Forestdale exit, alternating lane closures for bridge work, Monday-Friday from 7 a.m. to 3 p.m.
» Continuing
Lincoln: Wilbur Ave., one lane of alternating traffic on the bridge over Rte. 146.
North Smithfield: School St. Bridge over Rte. 146 closed to traffic, with a detour in place.
Back to top |
|
South County
»Overnight
Narragansett: Rte. 108 NB & SB (Pt. Judith Rd.), Dillon Rotary to Woodruff Ave., lane closures possible due to bridge work, Sunday night from 9 p.m. to 5 a.m. and Monday-Thursday nights from 8 p.m. to 5 a.m.
»weekday
Narragansett: Rte. 108 SB (Pt. Judith Rd.), from MacArthur Blvd. at the Rte. 1 overpass to Woodruff Ave., lane closures possible for bridge work, Monday-Friday from 7 a.m. to 3 p.m.
» continuing
Hopkinton/Richmond: Bridge St. over the Wood River, closed to traffic due to bridge condition, detour in place.
Narragansett/South Kingstown: Rte. 1, from Wakefield exit to Salt Pond Rd. exit, new traffic pattern in place due to bridge reconstruction. All lanes shift; two-way traffic on SB bridge with two lanes SB and one lane NB.
Narragansett: On-ramp to Rte. 1 NB from corner of Rte. 108 (Pt. Judith Rd.), Woodruff Ave. and South Pier Rd. closed for construction until Fall 2010.
Back to top |
|
West Bay
» Weekday
Warwick: Rte. 2 NB & SB, from East Ave. (R.I. Mall) to West Natick Rd. (Warwick Mall), alternating lane closures possible for electrical work, Monday-Friday from 9 a.m. to 3 p.m.
Back to top |
| Subscribe to this Report
Email RIDOT
- Want to be notified whenever this page is updated? Click the the "Email RIDOT" text to send your address in an email. Be sure to use the words "Notify Me When Page is Updated" as the subject of your e-mail.
Traffic Signal Complaints
Submit a complaint about the timing or operation of a traffic signal through email with RIDOT's Traffic Signal Timing and Malfunction Complaint Form.
- This form works with Adobe Reader versions 6 and 7. You may need to download or update Adobe Reader in order to fill out and submit this form. Find downloads and updates here.
Air Quality
When the State Department of Environmental Management issues an Air Quality Alert,
passengers ride free on RIPTA buses. For information on air quality, please see the Rhode Island Department of
Environmental Management DEM Ozone Forecast.
Back to top |
|