I-95 logo Providence: Exit 22 (Downtown Providence/Routes 6 & 10) off of I-95 South will be closed for construction, Sunday and Monday nights from midnight to 6 a.m. the following day, and Tuesday night from 10 p.m. to 6 a.m. the following day. Follow signed detour.

I-95 logo Warwick: Exit 14 (Rte. 37) and Exit 15 (Jefferson Blvd.) off of I-95 North will be closed for paving, Tuesday and Wednesday nights from 9 p.m. to 6 a.m. the following day. Access to I-95 North from Rte. 37 and from Jefferson Blvd. will also be closed. Follow signed detours.

Overnight

I-95 logo Cranston/Warwick: I-95 North, from Jefferson Blvd. in Warwick to the Laurens St. overpass in Cranston, alternating lane closures for paving, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day.

I-95 logo Cranston/Warwick: I-95 South, from the Milford St. overpass in Cranston to Service Ave. in Warwick alternating lane closures for pavement milling, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day.

I-95 logo Exeter: I-95 North and South, from Exit 4 (Rte. 3) to Exit 5 (Rte. 102), right lane closed for construction, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day.

I-95 logo Providence: I-95 South, from Exit 23 (Rte. 146) to Exit 22 (Downtown Providence/Routes 6 & 10), right lane closed for construction, Wednesday night from 9 p.m. to 6 a.m. the following day.

I-95 logo Providence: I-95 North, from Exit 23 (Orms St.) to Industrial Dr., right lane and shoulder closures for survey work, Sunday-Thursday nights from 10 p.m. to 5 a.m. the following day.

I-95 logo Providence: I-95 South at the Providence Viaduct, alternating lane closures for bridge work, Tuesday from 9 p.m. to 5 a.m. the following day.

I-95 logo Warwick: I-95 North and South, from Exit 7 (New London Turnpike) to Exit 9 (Rte. 4), alternating lane closures for construction, Sunday night from 10 p.m. to 6 a.m. the following day, and Monday-Thursday nights from 8 p.m. to 6 a.m. the following day.

I-295 logo Warwick/Cranston: Expect alternating lane closures in a moving operation for striping on I-295 North and South, at I-95 North and South, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.

I-295 logo Warwick to Cumberland: Expect alternating lane closures in a moving operation for striping on I-295 North and South, from I-95 in Warwick to the Massachusetts state line in Cumberland, including ramps, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.

Weekday

I-95 logo Hopkinton: I-95 South at Exit 1 (Rte. 3), possible right shoulder closure for sign work, Thursday from 10 a.m. to 11 a.m.

I-95 logo Warwick: I-95 North at Exit 15 (Jefferson Blvd.), right shoulder closed for bridge work, Monday from 9 a.m. to 3 p.m.

Continuing

I-295 logo Cumberland/Lincoln: I-295 North, from Exit 9 (Rte. 146) to Exit 10 (Rte. 122/Mendon Rd.), motorists will continue to encounter the existing left lane closure from Old River Rd. to the Mendon Rd. overpass, with the right and center lanes open to traffic.

I-295 logo Cumberland/Lincoln: Motorists will still encounter a left lane closure from Exit 11 (Rte. 114/Diamond Hill Rd.) to Exit 10 (Rte. 122/Mendon Rd.), however traffic will be maintained in the center and right lanes of I-295 South. Truck traffic will no longer be directed to the left lane and the crossover will now be closed to traffic. Traffic utilizing the I-295 South on-ramp from Mendon Rd. will still be required to yield to highway traffic.

I-195 logo East Providence: The East Shore Expressway Bridge over Warren Avenue (Exit 7 off of I-195 East) is posted for use by vehicles under 17 tons. Signed detour for heavier vehicles.

I-95 logo Warwick/West Warwick: I-95 North and South at Exit 8 (Rte. 2), lanes shifted to the left. Use caution entering and exiting the highway.

Back to top


Other Limited Access Highway Restrictions

Overnight

Rte 99 Lincoln/Cumberland: Expect alternating lane closures in a moving operation for striping on Rte. 99 and its ramps, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.

Rte 6 Providence: Rte. 6 East and West, from Hartford Ave. to Rte. 10 South, right lane closed for construction, Monday-Thursday nights from 6 p.m. to 6 a.m. the following day.

Rte 146 Providence: Rte. 146 South, from Admiral St. to I-95 South at Exit 22 (Downtown Providence/Routes 6/10), right lane closed for construction, Monday-Thursday nights from 9 p.m. to 6 a.m. the following day.

Weekday

Rte 2 Rte 10 Cranston: Rte. 10 at Rte. 2 (Reservoir Ave.), right lane and shoulder closures for construction, Monday-Friday from 5 a.m. 3:30 p.m.

Continuing

Rte 114 Rte 38 Bristol/Portsmouth and Newport/Jamestown: Lane closure information for the Mt. Hope Bridge and the Pell (Newport) Bridge is available from the R.I. Turnpike and Bridge Authority.

Rte 6 Providence: Rte. 6 East and West, from Rte. 10 to the Hartford Ave. exit, lanes shifted to the right for construction.

Rte 6 Providence: On the ramp from Hartford Ave. to Rte. 6 West, traffic must come to a complete stop before merging with traffic.

Rte 6 te 10 Providence: Truck traffic is restricted to the right lane from the Westminster St. overpass over Rte. 10 South/Rte. 6 West to the Rte. 6/Rte. 10 interchange, and on Rte. 6 East at the Rte. 6/Rte. 10 interchange.

Back to top


Metropolitan Providence

Weekend Road Closure

Providence: Wickenden St. East, from South Main St. to the Point St. Bridge, road closed for paving, Saturday from 3 a.m. to 11 a.m. Follow signed detour.

Overnight

Rte 5 Rte 14 Cranston/Johnston: Rte. 5 (Atwood Ave.) North and South at Rte. 14 (Plainfield St.), alternating lane closures for construction, Monday-Thursday nights from 7 p.m. to 7 a.m. the following day.

Cranston: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • East St.; Elmwood Ave.; Mayfield Ave.; Pontiac Ave.

Rte 1A Rte 114 Rte 114A East Providence: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Bishop Ave.; Bullocks Point Ave.; Highland Ave.; Metropolitan Park Dr.; Mink Rd.; Newman Ave.; Rte. 1A (Newport Ave.); Rte. 114 (Pawtucket Ave.); Rte. 114A (Pleasant St.); Potter St.

Rte 1 Providence: Rte. 1 (Elmwood Ave.), from Daboll St. to Trinity Sq., alternating lane closures for paving, Sunday and Monday nights from 8 p.m. to 6 a.m. the following day.

Rte 6 Providence: Rte. 6 East and West, from Hartford Ave. to Rte. 10 South, right lane closed for construction, Monday-Thursday nights from 6 p.m. to 6 a.m. the following day.

Rte 146 Providence: Rte. 146 South, from Admiral St. to I-95 South at Exit 22 (Downtown Providence/Routes 6/10), right lane closed for construction, Monday-Thursday nights from 9 p.m. to 6 a.m. the following day.

Weekday

Rte 1A Cranston: Rte. 1A (Broad St.) North, from Peck Lane to Bridge St., right shoulder closed for a bridge inspection, Monday from 9 a.m. to 3 p.m.

Rte 2 Rte 10 Cranston: Rte. 10 at Rte. 2 (Reservoir Ave.), right lane and shoulder closures for construction, Monday-Friday from 5 a.m. 3:30 p.m.

Cranston: Phenix Ave. at Scituate Ave., right lane and shoulder closures for construction, Monday-Friday from 5 a.m. 3:30 p.m.

Rte 146 Johnston: On the ramp from Rte. 6A (Hartford Ave.) to Rte. 6 East, alternating right and left shoulder closures for a bridge inspection, Wednesday from 9 a.m. to 3 p.m.

Rte 1 Providence: Rte. 1 (Elmwood Ave.) North and South, from Cadillac Dr. to Service Rd. No. 7, alternating lane closures for construction, Monday-Friday from 6 a.m. to 3 p.m.

Providence: Broad St. North and South, from Trinity Sq. to Service Rd. No. 7, alternating lane closures for construction, Monday-Friday from 6 a.m. to 3 p.m.

Providence: Providence Place East, from Harris Ave. to Park St., left lane and sidewalk closures for construction, Tuesday-Friday from 9 a.m. to 3 p.m.

Continuing

Johnston: The Morgan Avenue Bridge is closed to traffic. Follow signed detours. The bridge is scheduled to reopen to traffic during this construction season.

Providence: A new traffic pattern is in effect on Wickenden St., from Benefit St. to the Point St. Bridge. Those traveling west on Wickenden St. will be restricted from turning left onto South Water St. To access I-195, motorists will turn right onto South Main St., left onto James St., and a left onto South Water St. to reach the on-ramp to I-195 East. Click here for a detour map.

Providence: Dyer St., between Clifford St. and Dorrance St., is now two-way, but parking is no longer permitted. This change is part of the reconstruction of Dyer St., between Dorrance St. and Orange St., and is scheduled to last through October. See Detour »

Providence: South Main St. North, from Wickenden St. to James St., travel lanes are narrowed and parking is no longer permitted through Summer 2014.

Providence: Dyer St., from Peck St. to Ship St., two-way traffic pattern in place for construction associated with the Iway (I-195 Relocation Project).

Providence: A lane shift exists on Wickenden St., from South Main St. to South Water St., for construction associated with the Iway (I-195 Relocation Project).

Providence: Visit the City of Providence’s online calendar for traffic restrictions.

Back to top


East Bay

Overnight

Barrington: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • County Rd.; Massasoit Ave.; Middle Hwy.; Nayatt Rd.; New Meadow Rd.; Park & Ride; Primrose Hill Rd.; Rumstick Rd.; Sowams Rd.; Washington Rd.

Rte 114 Rte 136 Bristol: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Ferry Rd.; Gooding Ave.; Griswold Ave.; Rte. 114 (Hope St.); Rte. 136 (Metacom Ave.); Old Ferry Rd.; Old Metacom Ave.; Poppasquash Rd.

Rte 103 Rte 114 Rte 136 Warren: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Birch Swamp Rd.; Rte. 103 (Child St.); Rte. 136 (Kickemuit Rd.); Market St.; Rte. 136 (Metacom Ave.); Route 103/114 (North and South Main St.); Old Market St.; Park & Ride; School House Rd.; Vernon St.

Weekday

Barrington: Massasoit Ave. East and West, from Martin Ave. to County Rd., an alternating traffic pattern is anticipated for construction, Monday-Friday from 7 a.m. to 3:30 p.m.

Back to top


Newport County

Continuing

Rte 114 Rte 38 Bristol/Portsmouth and Newport/Jamestown: Lane closure information for the Mt. Hope Bridge and the Pell (Newport) Bridge is available from the R.I. Turnpike and Bridge Authority.

Back to top


Northern R.I. & Blackstone Valley

Overnight

Rte 99 Lincoln/Cumberland: Expect alternating lane closures in a moving operation for striping on Rte. 99 and its ramps, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.

Weekday

Rte 102 Burrillville: Rte. 102 (Broncos Hwy.), from the Glocester Town Line to Inman Rd., alternating lane closures for striping and installing rumble strips, Monday-Friday from 6 a.m. to 5:30 p.m.

Rte 116 Cumberland/Lincoln: Rte. 116 North at the Ashton Viaduct, right lane closed for bridge work, Wednesday and Thursday from 9 a.m. to 2:30 p.m.

Rte 122 Cumberland/Lincoln: Rte. 122 (Mendon Rd.), from Lonsdale Ave. to Ann and Hope Way, right lane closed for construction, Tuesday-Friday from 7 a.m. to 3 p.m.

Rte 116 Lincoln: Rte. 116 North and South, from Great Rd. to Albion Rd., alternating lane closures in a moving operation for a bridge inspection, Thursday and Friday from 9 a.m. to 3 p.m.

Rte 44 Smithfield: Rte. 44 (Putnam Pike) West at the Putnam Pike Bridge at I-295, left lane closed for bridge work, Monday and Tuesday from 9 a.m. to 2:30 p.m.

Continuing

Rte 5 North Smithfield: Rte. 5 (Providence Pike), between Main St. and Church St. in Slatersville, there is a single-lane alternating traffic pattern due to bridge condition. Portable traffic signals are in place to direct vehicles over the bridge.

Rte 5 Scituate: The Kent Dam Spillway Bridge and Rte. 12 (Scituate Ave.), from Rte. 116 to Howard Ave., are closed through the end of the year. Follow signed detours. See Detour Map »

Back to top


South County

Road Closure

Rte 165 Exeter: Rte. 165 at Rte. 3, road closed for construction, Tuesday and Wednesday nights from 9 p.m. to 6 a.m. the following day. Follow detour using Arcadia Rd., Main St. and Rte. 3. Get Detour Map »

Weekend

Rte 165 Exeter: Rte. 165 East and West at Rte. 3, alternating shoulder closures for construction, Saturday from 7 a.m. to 3:30 p.m.

Overnight

Rte 165 South Kingstown: Rte. 108 North and South, from the Narragansett Rotary to Old Mountain Field, alternating lane closures for milling and cold planing, Wednesday and Thursday nights from 7 p.m. to 7 a.m. the following day.

Rte 138 South Kingstown: Rte. 138 East and West, from Rte. 2 to Rte. 110, one lane of alternating traffic for pavement repairs, Monday night from 7 p.m. to 7 a.m. the following day. Paving was completed on Monday night so Tuesday’s scheduled operation has been canceled.

Weekday

Rte 2 Charlestown: Rte. 2 (South County Trail) South, from Kenyon School Rd. to New Biscuit City Rd., shoulder closures for a bridge inspection, Tuesday from 9 a.m. to 3 p.m.

Rte 165 Exeter: Rte. 165 East and West at Rte. 3, alternating shoulder closures for construction, Monday-Friday from 7 a.m. to 3:30 p.m.

Rte 165 South Kingstown: Rte. 108 North and South, from the Narragansett Rotary to Old Mountain Field, alternating lane closures for construction, Monday-Friday from 6 a.m. to 2 p.m. There will also be lane restrictions on Old Tower Hill Rd. and Main St. just east and west of the intersection with Rte. 108.

Continuing

North Kingstown: Railroad Ave., between Hidden Lane Dr. and Liberty Rd., lanes restricted because of bridge condition.

Back to top


West Bay

Overnight

Rte 401 East Greenwich: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Rte. 401 (Division Rd.) and Rte. 401 (Division St.)

Rte 1 Rte 5 Rte 113 Warwick: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Airport Rd.; East Ave.; Elmwood Ave.; Greenwich Ave.; Ives Rd./Forge Rd.; Rte. 5 (Lambert Lind Hwy.; Rte. 113 (Main Ave.); Narragansett Pkwy.; Old Greenwich Ave.; Park & Ride; Post Rd.; Veterans Memorial Dr.; Warwick Industrial Dr.

Rte 3 Rte 102 West Greenwich: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Division Rd.; Escoheag Hill Rd.; Hopkins Hill Rd.; Lakeshore Dr.; Rte. 3 (Nooseneck Hill Rd.); Park & Ride; Town Hall Rd.; Rte. 102 (Victory Hwy.); Weaver Hill/Big River Access Rd.

Rte 3 Rte 115 Rte 117 West Warwick: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 7 p.m. to 5 a.m. the following day.

  • Cowesett Ave.; East Main St.; Fairview Ave.; Legion Way; Rte. 117 (Legris Ave.); Main St.; Rte. 115 (Main St.); Providence St.; Roberts St.; Rte. 3 (Tiogue Ave.); Washington St.; West Warwick Ave.

Weekday

Rte 1 Warwick: Rte. 1 (Post Rd.) North, from West Shore Rd. to Veterans Memorial Dr., two lanes closed for construction, Monday-Friday from 6 a.m. to 4:30 p.m.

Rte 1 Warwick: Veterans Memorial Dr., from Rte. 1 (Post Rd.) to Greenwich Ave., one lane closed for construction, Monday-Friday from 6:30 a.m. to 4 p.m.

Rte 117 Warwick: Rte. 117 (Centerville Rd.), from Diamond Hill Rd. to Tollgate Rd., one lane closed for construction, Monday-Friday from 9 a.m. to 2:30 p.m.

Rte 117 Warwick: Rte. 117 (Warwick Ave.), from Waite Ave. to Herff Jones Way, right lane and shoulder closures for a bridge inspection, Wednesday from 9 a.m. to 3 p.m.

Back to top


Bike Path Closures

Continuing

East Providence/Providence: The East Bay Bike Path over the Washington Bridge, from India St. in Providence to Warren Ave. in East Providence, is closed until Fall 2014 for rehabilitation. Cyclists can detour using Waterfront Dr. and the Henderson Bridge. Learn more »

Coventry: The Washington Secondary Path, Trestle Trail segment, from west of Town Farm Road to Log Bridge Road, is under construction and closed through Fall 2014.

South Kingstown/Narragansett: Repair work on the South County Bike Path beginning July 28, including pavement repair and new signage and striping. The bikeway will remain open at all times, but those using the path weekdays from 7 a.m. to 6 p.m. may encounter work and will need to dismount and walk their bikes around construction areas. We expect to complete these improvements by late October. See map »